- Acquired high grade Cu (copper) property Sept 2004;
- Grab samples over 10 x 10 metres at 20 metre intervals yielded approximately 4 to 16% copper;
- Work program in progress May 2005. line cutting and mag sureys;
- C/A signed by two producers;
- Drilling completed in 2006 analysis of project underway
- Optioned to Ressources Appalaches in Dec 2006
- 50% owned by Quinto
- $1m of work to be performed over a five year period.
|
|